Metro Phase II India

Delhi Metro Phase II

Metro tunnel

Delhi, India

Herrenknecht EPB Shield S-411, S-412, S-445, S-446, S-447, S-448, S-495, S-496

Diameter: 6,540mm, 6,580mm, 6,640mm
Tunnel length: 1,506m, 1,540m, 1,883m, 1,961m, 1964m, 2,098m, 2,175m, 2,220m

8 GTE experts in action in 2008 and 2009.

|  5 TBM PLC Electrician  |  2 TBM Operator  |  1 TBM Hydraulic fitter   |

 

link back

Rivium 2e straat 41b
2909 LG Capelle aan den IJssel
The Netherlands

Phone: +31 (0) 10 266 94 44
Fax: +31 (0) 10 266 94 45

info(at)global-tunnelling-experts.com