Railway Tunnel Project Beijing

Railway tunnel

Beijing, China

NFM Mix Shield

Diameter: 9,900mm
Tunnel length: 5,900m

4 GTE experts in action in 2008 and 2009.

|  1 TBM hydraulic foreman  |  2 TBM mechanical supervisors  |  1 TBM Operator   |

 

link back

Rivium 2e straat 41b
2909 LG Capelle aan den IJssel
The Netherlands

Phone: +31 (0) 10 266 94 44
Fax: +31 (0) 10 266 94 45

info(at)global-tunnelling-experts.com